Pictures Preparation

Preparing the frame work which needed to fix all masts and antennas

Testing the masts on the frame
The arrival of the GB Towers
Some of the many cases all split out by camp

And more boxes some 90Kg each
Cables, cables and more cables

T33C / Mobile
In this way we will transport gasoline and water to the different camps

 
Many KM of guy wires are pre-cut to save time on Banaba
© 2003-2004, all rights reserved by the Banaba DX-pedition Team
Web-site design: Rob Snieder PA2R