Operator List: Kadmat (Last updated:
31 January 2007)
Name |
Home Call |
VU Call |
|
Name |
Home Call |
VU Call |
Adolph H Kryger |
WA9QJH |
VU3KHX |
|
Leszek Fabjanski |
SP3DOI |
VU3NZC |
Bernd Guenter Willeke |
DL5OAB |
VU3RYM |
|
Nisha M Mohan |
VU2NIS |
VU2NIS |
Douglas J Faunt |
N6TQS |
VU3RYN |
|
Pat Vermote |
F6IIT |
VU3MVZ |
Florent Moudar |
F5CWU |
VU3SIC |
|
Rob Snieder |
PA2R |
VU3SXJ |
Frank Rosenkranz |
DL4KQ |
VU3FRK |
|
Ronald Stuy |
PA3EWP |
VU3SXR |
Gregor Fismer |
DF2IC |
VU3FGR |
|
Siegfried Presch |
DL7DF |
VU3RYB |
Janusz Ambrozy |
SP3CYY |
VU3RYG |
|
Sylvain Lefevre |
F4EGD |
VU3SIB |
Joe L Blackwell |
AA4NN |
VU3JLW |
|
|
|
|
|
Site
Characteristic
-
Kadmat Site will have three
(3) independant operation sites dedicated to CW, SSB and
Digital Modes
-
Physical Site Separations (CW to SSB 2.5 km, SSB to Digital
500 m) will allow up to 3 signals at same time on same band
- For
best performance all verticals will get erected at waterfront
- All
verticals and yagis, even within one site, will have
sufficient physical separation
- About
1400 m coax cables were shipped to Kadmat
- Bamboo
poles of 40+ ft length were shipped to Kadmat for sufficient
yagi heights (delivered 20 feet)
- Kadmat
will maintain a 24 h non-switched line for internet access,
log uploads, pilot contacts (is not delivered, will use the high school duing day time 10-16 hrs).
-
Advance Team starts with setups already on January 09th
Weather Forecast Kadmat
|
|
Planned Antenna's
- 6 RX Beverages (done)
- 160 m Vertical CW (done)
- 160 m Vertical SSB
- 80 m Vertical CW (done)
- 80 m Vertical SSB (done)
- 40 m Phased Verticals (2 ele) CW (done)
- 40 m Phased Verticals (4-square)
SSB (done)
- 30 m Phased Verticals (2 ele) CW (done)
- 30 m Vertical Digital (done)
- Highband 5 Band Yagis (1 Spider Beam, 2
Hex Beams) CW (done)
- Highband 5 Band Yagis (3 Spider Beams)
SSB (2 done)
|
|
Rigs
- Seven (7) ELECRAFT
K2/100 (running stations)
- Two (2) ELECRAFT
K2/100 (monitoring- spare stations)
|
|
|
|